The redevelopment of the industrial plant was, generally speaking, in a profound modification of the existing building in 1966 to accommodate the requirements of GMP 2004. In practice represented almost total dismantling of facilities, including roofs and floors, for within the existing perimeter walls, developing a new project in accordance with the new technologies available.
The air conditioning system pharmacist, extensive use of coating materials for industry specific, typological scheme according to the projected production and tougher safety standards of production and labor were the key that was designed with this new phase of the Industrial plant. Under the supervision of the Engineering Headquarters in Basel, Switzerland, our firm designed and supervised the execution of the works that culminated in June 2004 and is now fully operational.